Solar parks and consulting for investors
TeraVolti helps you build a ground-mounted solar park, from the first study to the grid connection. We work with investors, businesses and institutions.
What the service includes
- The feasibility study and the investment analysis.
- The Environmental Impact Assessment report through to environmental consent.
- The environmental permit and the construction permit.
- The steps through to grid connection and KOSTT approval.
- The documentation for ZRrE.
- The technical reports, drawings and electrical diagrams.
These services are provided by a licensed team with experience in Kosovo, Austria and Germany.
The steps of a solar park
- Site analysis: the land, the irradiation and the distance from the grid.
- The feasibility study and the financial plan.
- The environmental, construction and connection permits.
- The technical design and the choice of panels and inverters.
- Construction, connection and commissioning.
- Monitoring and maintenance.
Reference project
Our 1,000 kWp project in Lipjan. In Kosovo, 1 kWp produces about 1,250 kWh a year, so a 1,000 kWp park produces about 1,250,000 kWh a year.
Maintenance after construction
Parku solar prodhon më pak kur panelet janë të pista ose kur një pajisje ndalet pa u vërejtur. Ne ofrojmë pastrim, kontroll dhe monitorim. Shihni panel cleaning and maintenance.
Contact us about your project
Na shkruani në info@teravolti.com ose na telefononi për një takim. Për projekte më të vogla, përdorni formën Get a quote.