Solar parks and consulting

Solar parks and consulting for investors

TeraVolti helps you build a ground-mounted solar park, from the first study to the grid connection. We work with investors, businesses and institutions.

What the service includes

  • The feasibility study and the investment analysis.
  • The Environmental Impact Assessment report through to environmental consent.
  • The environmental permit and the construction permit.
  • The steps through to grid connection and KOSTT approval.
  • The documentation for ZRrE.
  • The technical reports, drawings and electrical diagrams.

These services are provided by a licensed team with experience in Kosovo, Austria and Germany.

The steps of a solar park

  1. Site analysis: the land, the irradiation and the distance from the grid.
  2. The feasibility study and the financial plan.
  3. The environmental, construction and connection permits.
  4. The technical design and the choice of panels and inverters.
  5. Construction, connection and commissioning.
  6. Monitoring and maintenance.

Reference project

Our 1,000 kWp project in Lipjan. In Kosovo, 1 kWp produces about 1,250 kWh a year, so a 1,000 kWp park produces about 1,250,000 kWh a year.

Maintenance after construction

Parku solar prodhon më pak kur panelet janë të pista ose kur një pajisje ndalet pa u vërejtur. Ne ofrojmë pastrim, kontroll dhe monitorim. Shihni panel cleaning and maintenance.

Contact us about your project

Na shkruani në info@teravolti.com ose na telefononi për një takim. Për projekte më të vogla, përdorni formën Get a quote.