Solar panels in Gjilan for homes and businesses

TeraVolti installs solar panels in Gjilan for homes and businesses. We do not have an office in Gjilan. We serve customers in Gjilan from our Ferizaj office and from our head office on the Ferizaj–Prishtina highway, Babush i Muhaxherëve, 14000 Lipjan. In Gjilan too, the site visit, consultation and quote are free, at no extra cost. We prepare and submit the documents to the Municipality of Gjilan, KEDS and ERO (ZRRE), and this is included in the price.

How we serve customers in Gjilan

You do not need to come to an office. The process works like this:

  1. Contact us by phone, on WhatsApp or through the online form, and tell us about your consumption and your building.
  2. Our team comes to your address in Gjilan to check the roof, the meter and the electrical supply. The visit is free.
  3. We send you a quote with the system size, the equipment and the warranties.
  4. We prepare and submit the documents to the municipality, KEDS and ERO.
  5. Mounting, installation and commissioning take about 2 days.
  6. After grid connection and licensing, your system produces energy. After installation we offer cleaning, maintenance and servicing.

Under normal circumstances, the whole process takes 60–120 days.

Our project in Gjilan: the Behluli family, 7 kWp

In Gjilan we have published the Behluli family project, a 7 kWp on-grid system for a home.

This is the only Gjilan project we have published so far. Our nearest projects are in Ferizaj, where we have systems for homes and businesses from 4 kWp to 256 kWp. All our projects are on the Projects page.

Which system suits your home or business in Gjilan

  • For homes. A typical system is about 8 kWp. The final size is set after the site visit, based on your annual consumption and your roof. Many families choose 7 kWp on-grid, as the Behluli family did.
  • With a battery. A hybrid system with a hybrid inverter and a battery gives you power in the evening or when the grid is down.
  • For businesses. Capacity is calculated from consumption during working hours, for anything from shops and offices to warehouses and factories.

Permits in Gjilan: municipality, KEDS and ERO

  • Three approvals. A grid-connected system needs consent from the Municipality of Gjilan, consent from KEDS and a prosumer licence from ERO (ZRRE).
  • Building permit. For systems up to 7 kWp, the building does not need to be legalised or have a building permit. For systems above 7 kWp, the building must be legalised or have a valid building permit.
  • KEDS. The investor must not have debts to KEDS. The investor pays the KEDS costs for upgrading the meter capacity and for the KEDS field team visit. These are usually two invoices.
  • Cables. If the inverter is more than 10 metres from the main supply, the investor provides the cables and materials, while TeraVolti does the labour.

Full guide: en/licencimi-paneleve-solare-kosove.

Equipment and warranty

We install equipment from certified manufacturers, with CE, TÜV and ISO certification. Our online shop carries JA Solar, Sungrow, Solis, Growatt, Deye and Pylontech, and we deliver across Kosovo, including Gjilan. Panels carry a 15-year warranty against defects and a 30-year performance warranty. Inverters carry a 5–7 year warranty, which can be extended to 10 or 25 years. The structure and the batteries carry a 10-year warranty, and installation work carries 1 year.

Frequently asked questions about solar panels in Gjilan

Do you have an office in Gjilan?

No. Our offices are in Lipjan (head office), Prishtina and Ferizaj. We serve customers in Gjilan from Ferizaj and Lipjan, and our team comes to your address.

Do you charge for a site visit in Gjilan?

No. The site visit, consultation and quote are always free, at no extra cost, in Gjilan too.

How long does installation take?

Mounting, installation and commissioning take about 2 days. The whole process, including permits and grid connection, takes 60–120 days under normal circumstances.

Do I need a building permit?

Not for systems up to 7 kWp. For systems above 7 kWp, the building must be legalised or have a valid building permit.

Do you have projects in Gjilan?

Yes. We have published the Behluli family project, a 7 kWp on-grid system. You can find other nearby projects on the Ferizaj page and on the Projects page.

Request a free quote for Gjilan

Our experience with solar systems goes back to 2018, and since 2023 we have been working as TeraVolti, with 25 employees. We have installed 13.2 MWp across more than 425 systems throughout Kosovo. For other cities, see Solar panels in Prishtina and Solar panels in Ferizaj.